Case Study – Woodside North Rankin NRA / NRB hook Up.

Project Background Woodside’s health and safety policy for suspended loads required Binder Group to develop a custom engineered pipe support solution to enable large diameter piping to be installed.  The usual method for installing vertical riser supports is to have four equally spaced lugs welded onto the pipe and for the mechanical riser support to clamp around the pipe underneath the...

Read More